Preliminary site inspections

Before anything takes place, a professional from the selected company should come over to see the location. Or else, you should send them enough photographs to do the visual evaluation. However, it’s highly advised to do what the contractor requests the most.

Soil testing

Because there would be a subsequentexcavation, the nature of the soil in terms of the stiffness, and even the placement of the water table must be checked.

Excavation and compaction

Once everything is green-lit, the excavation is followed by thorough compaction of the soil.

Reinforcement, formwork, plumbing, and conduits

Once the excavation and compaction of the soil are done, then we move to the structural stage. This is when all the rebars are laid according to the design specifications. Usually, the bar size doesn’t exceed the 12mm diameter bars except for special occasions in building In-ground Swimming Pools Sydney.

It’s essential to ensure that the spacing is always identical between bars unless specified otherwise. The rebars are then boxed by formwork and they’re well supported. Then comes the plumbing that goes under the concrete, along with electrical conduits as necessary.

Concreting

Once the formwork and everything inside are fully finished, the formwork must be well cleaned. If not the characteristic strength on the concrete is going to be in question. It’s also much better to shoot the concrete by a rapid tube instead of mere pouring where vertical areas can be a little to handle that way. Once the concrete is done, curing must be done either by water or by chemicals.

Electrical and mechanical works

This is the stage where all the filters and such are fixed at the necessary locations. It’s always better to make sure that they were working and of the finest condition. If there are separate warranties for the electrical and mechanical items, knowing all the exceptions in terms and conditions will help you alt in the long run.

Finishing

Now that the electrical works are finished, the attention is on the finishing. This is when the interior is tiled, along with the exterior and pool ladders are fixed. Be sure to inspect the quality of finishing to ensure that you do not have to settle down for mistakes since rectifying once everything has settled is going to be a bit impractical.

Filling and chemical treatment

Following the finish, the water is filled along with the ideal chemical characteristics that are required for different specific settings.

Handover

Once everything is done and dusted, you’re going to see a beautiful pool ready to be used. But before the contractors leave, ensure to double-check anything and everything since once they leave, the warranty period more or less starts off.